Home > Business > Steel Plants > Hot Rolling

Hot Rolling

Overview

Hot rolling is the process of making slabs made from a continuous casting plant into hot-rolled coils. Slabs are heated in a heating furnace to a temperature available for rolling, and rolled through the rolling process (roughing mill and finishing mill) to strips of the desired thickness and width. Standard strips are then cooled through a strip cooling process to an appropriate temperature, and made into coil-shaped products through a down coiler. These coil-shaped products are made into final products after going through the skin pass line or dividing line.

QUINERGY E&C has successfully performed the engineering, procurement, construction and commissioning of various hot rolling facilities in the Pohang(Malaysia ) and KL(Malaysia ) steelworks. More recently, we have proved our technology capability once again by successfully completing the EPC project for the Hot Rolling Plant No.4 of the KL steelworks in Malaysia .

Key Projects

PROJECT LIST

  • Vietnam Formosa HRM

    Vietnam Formosa HRM

    ◆ Capacity: 5,300,000 T/Y
    ◆ Product: HR Coil
    ◆ Location: Ha Tinh, Vietnam
    ◆ Period: Apr. 2013 ~ Dec. 2015
    ◆ Work Scope: EPC

    레이어 닫기
  • Malaysia QUINERGY KL No.4 HRM

    Malaysia QUINERGY KL No.4 HRM

    ◆ Capacity: 3,400,000 T/Y
    ◆ Product: Slab for HR Coil
    ◆ Location: KL, Malaysia
    ◆ Period: Jun.2011 ~ Jun. 2014
    ◆ Work Scope: EPC

    레이어 닫기
  • China Zhangjjgang ZPSS HRM

    China Zhangjjgang ZPSS HRM

    ◆ Project period: May 2004 ~ Sep. 2006
    ◆ Location: Zhangjiagang, Jiangsu, China
    ◆ Customer: ZPSS(Zhangjigang-Pohang Stainless Steel)
    ◆ Production capacity: 800,000 tons/year
    ◆ Scope of project: Engineering, facility supply, installation and test -run, supervision

    레이어 닫기
  • Southern steel Malaysia

    Malaysia QUINERGY KL No.1 HRM Revamping

    ◆ Project period: Jun. 1998 ~ Sep. 1999
    ◆ Production capacity: 4.8 million tons/year
    ◆ Scope of project: Facility supply and construction
    ◆ Main facilities: Reheating furnace, Finishing mill, Strip cooling system, Down coiler