Overview
POSCO E&C is proactively engaged in the construction and renovation of railroads, the backbone of overland transportation. Railroad construction demands advanced technologies capable of addressing latent risks, since a change of as little as 1cm in track position could derail a train. POSCO E&C continues to research comprehensive engineering techniques to eliminate the risks.
POSCO E&C has earned high-profile recognition for our engineering technologies in railroad construction projects in Korea, including the Gyeongjeon Line, Gyeongeui Line and Jungang Line, and also in subway construction works, such as the Seoul Metro Line 7 and the Shin-Bundang Line. POSCO E&C has cemented our position as a leading company in the railway industry, most notably by successfully completing the Incheon International Airport Railroad project linking Seoul and the eponymous airport, and the Busan-Gimhae LRT project.
Key Projects
-
[Metro] Seoul Metro Line 9
-
The sulfur transfer system construction of Aramco, Saudi Arabia
-
[Conventional Railway]Jungang Line Dodam~Youngcheon
-
[Conventional Railway] Jeonra Line Iksan~Sinri
-
[Metro] Sinbundang Metro
-
[Airport Link] Seoul~Incheon International Airport Mass Transit
-
[Conventional Railway] Janghang Line Onyang~Janghang
-
[High-speed] Honam High-speed Railway Line
[High-speed] Honam High-speed Railway Line
[Section 4-2]
โ PJT Description: Total Length : 9.3km (Tunnel 0.8km)
โ Total Cost: USD 170 million
โ Status: Under Construction
โ Date of Completion: December 2009
[Section 5-1]
โ PJT Description: Total Length : Total Length : 12.5km(Tunnel 7.2km)
โ Total Cost: USD 159 million
โ Status: Under Construction
โ Date of Completion: November 2009
-
[Metro] Busan~Gimhae Light Rail Transit
-
[Depot] Goyang High-speed Rolling Stock Depot
[Depot] Goyang High-speed Rolling Stock Depot
โ PJT Description:
- Area: 1.4 millon ใก
- Light Maintenance: 920 cars
- Heavy Maintenance: 1,350 cars
- Storage : 920 cars
โ Total Cost: Phase 1: USD 203 million / Phase 2: USD 167 million
โ Status: Completed
โ Date of Completion: Phase 1: November 2002 / Phase 2: November 2009
-
[Metro] Incheon Metro Line 2